Frequently Asked Questions
Expert answers to your custom home design and construction questions.
Your Vision, Managed From Concept to Completion.
Designing a home is only the beginning. At Nauta Home Designs, we provide the expert roadmap to take your project from the initial sketch right through to finished construction.
Building in Ontario requires a partner who understands the full picture. Our process integrates BCIN-licensed design, verified construction financing, and comprehensive project management to ensure your vision is buildable, fundable, and permitted. Explore our video library below to learn how we help you navigate the complexities of the design-build journey and bring your project to life without the stress of the unknown.
What’s The Cost Of A Custom Home Design?
Do You Have A BCIN License?
Do You Design Within Our Budget?
What Is Your Design Expertise?
At Nauta Home Designs, we offer a range of design services including custom homes, additions and renovations, detached structures, and secondary/accessory dwelling units (SDUs/ADUs). Our experience spans residential and small commercial projects in styles ranging from traditional to modern.
Custom Homes: Thoughtfully designed, functional spaces with balanced proportions and scale.
Additions & Renovations: Seamless home expansions, second-storey additions, and modern updates that integrate with existing structures.
Detached Structures: Garages, workshops, and storage buildings designed to complement your home.
SDUs/ADUs: Guest suites, rental units, and home offices that maximize space while maintaining comfort and privacy.
What’s required for a Building Permit and does Nauta Home Designs apply for it?
Nauta Home Designs does not include building permit applications in our standard contract but can assist for an additional fee. Clients remain responsible for certain components of the permit process.
Typical Ontario building permit requirements include:
Construction blueprints, Schedule 1 form, and EEDS – provided by Nauta Home Designs
HVAC design – completed by a licensed HVAC designer (can be arranged for an additional fee)
Structural engineering – required for elements outside Ontario Building Code Part 9 (coordination available for an additional fee)
Legal grade survey / site plan – prepared by an Ontario Land Surveyor or Engineer; basic plans provided for small projects
Pre-engineered wood products – supplied by your lumber provider
Septic permit – completed by a BCIN-licensed septic designer
We recommend confirming project-specific requirements with your contractor or local permitting authority to ensure a smooth approval process.
What Is Your Design Timeline?
Timelines vary depending on the scope and type of project:
Custom homes and additions/renovations: approximately 1–6 months
Secondary Dwelling Unit (SDU) conversions: typically 1–3 months
Simple detached garages: approximately 1 month
What Happens If We Don’t Like The Design Or Need Changes?
At Nauta Home Designs, we offer unlimited design revisions throughout the design phase to ensure the final result reflects your vision. We begin by refining layout and functionality, then focus on personal design details. Multiple design options are provided to explore possibilities and support informed decisions, and revisions are encouraged as part of our collaborative process. Once finalized, we prepare permit-ready construction drawings and complete any revisions required for approval, ensuring a smooth transition to permitting.
What Does The Design Process Look Like For Us?
At Nauta Home Designs, we follow a structured process to ensure your project is efficient, meets regulations, and aligns with your vision.
Complete Project Quote Form
Attend Free Initial Consultation (on-site for renovations, at our office for new homes)
Receive Quote and Deposit – Project begins upon deposit payment
Review Zoning and Site Compliance (setbacks, lot coverage)
Check for Required Approvals (e.g., septic, conservation)
Draft Initial Plans
Revise Design – Optimize space with client input
Finalize Floor Plans and Elevations
Apply for Planning Approvals (if needed, Nauta can act as your agent for an extra fee)
Finalize Design Details (finishes, layouts)
Ensure Compliance with Building Code and Cost Efficiency
Prepare Final Construction Blueprints and BCIN stamp
Send Blueprints for Permit Submission – Any deficiencies are corrected at no extra charge
This process ensures clear communication and a design that meets your needs and budget.
Do You Provide Service And Support After The Permit Is Issued?
How Do You Incorporate Our Personal Style In The Design?
What Should I Prioritize In My Home Design?